Tuesday, 6 April 2010
Monday, 5 April 2010
Kitchen makeover: Day 9
Last day today!! Just time to grout the wall tiles and do some finishing touches of woodwork - then it's back to the real world!
Labels:
diy,
kitchen makeover
Sunday, 4 April 2010
Kitchen makeover: Day 8
The primer took four hours to dry so we used the time to go off to a tiling place and get some 3mm spacers. The bloke in the tiling shop gave us some good advice about marking out from the centre of the wall so that you're not left with too small gaps to cut tiles for at the edges.
After the upstands were in place it was time to tile over the top. I was slopping the adhesive on and sticky the tiles to the wall while Radka worked out the pattern - amazing how difficult it is to create a random pattern!
We tiled the gap behind the cooker so that hopefully it's easier to clean than the wallpaper that had been there. We've also put a 3 tile high border around the worktops.
So, we're nearly there. Grouting and little jobs like the skirting and painting the coving is left to do (plus I need to cut a 50cm bit of worktop and tile above a stand alone cupboard that we've been using to do all the tile cutting from). Then it's time for a well earned trip to the pub...
Labels:
diy,
kitchen makeover
Saturday, 3 April 2010
Kitchen makeover: Day 7
Yesterday started with our daily trip to the DIY stores for some bits and pieces. While we were looking at the wall tile spacers a professional tiler stopped and advised us to use 3mm spacers for our wall tiles (the only size they didn't have!) so we've got another trip to a bigger DIY store today.
Back at home I worked on cutting the upstands and attaching the end finishing strips to finish the worktops while Radka worked on finishing touches to some of the paintwork and grouted under the washing machine and cooker areas. Later I got pack of waste pipe work and fitted it to the sink (I wasn't really happy with the pipework that was already there. I was a little bit overwhelmed by the amount of bits you get in the pack though. I wonder if it matters that there are a few bits left over?
Labels:
diy,
kitchen makeover
Friday, 2 April 2010
Kitchen makeover: Day 6
Unfortunately I was using a jigsaw to cut the tops (if I were doing this again I might invest in a router). The jigsaw had a nasty habit of leaning of to one side as the cut was made. Whilst it's easy enough to keep it in line with the line that's marked, underneath the board the blade had flexed so that the cut edge was angled.
In terms of actually fitting them together, the worktops are fairly well supported by cupboards so we used mending plates to join them. Before screwing them into place we applied a bead of colorfill to the joined edge. This is a colour matched resin that hardens to produce a pretty seamless gap.
After the worktops were joined, we tiled under where the washing machine and cooker will go and also removed the old cooker hood.
Today, we're planning to finish the worktops by applying endstrips and then finish the rest of the floor tiling and some other little jobs.
Labels:
diy,
kitchen makeover
Thursday, 1 April 2010
Kitchen makeover: Day 5
After the first couple of worktops came out I needed to work out how to disconnect the taps to the old sink. This involved turning off both the hot and cold water supplies. First I looked for an isolation valve - sadly there were none so it was a case of turning off the mains for the cold water and draining the tank for the hot. When I started to drain the hot water tank I could hear it refilling again. This meant that it was fed from the cold tank in the loft. Fortunately, there's a tap to turn off the supply *to* the hot water tank to stop it from re-filling.
Once the tank was drained and the mains were off it was quite easy to disconnect the taps and get the last worktop out. At this stage I took out a section of the hot water pipe and installed an isolation valve. This meant that the tap to the hot water tank could be turned back on while we worked.
One weird side effect is that the toilet cistern now overflows. Reading up on the valve that we have - it is prone to getting debris in and that can stop it from turning off the water when the cistern is full. I didn't feel like dealing with this at 23:00 last night so that is the first job for today!
Labels:
diy,
kitchen makeover
Wednesday, 31 March 2010
Kitchen makeover: Day 4
After that it was time to start on the tiling. The first thing was to set-out where the tiles would be. Everyone I've spoken to and everything I've read on tiling all say the same thing - setting-out is really important!.
We started off by dry laying a line of tiles between the internal door and the kitchen door.
We then did a line of tiles
After this it was almost time to start laying. Some of the advice said to cut tiles as you go and some to lay all of the whole tiles then go back to do the cut tiles.
I decided to go with the first option, so before laying the first tile I cut the tiles I'd need for that part of the floor.
The cutting machine is a bit of a scary beast (and makes a hell of a noise) but it does the job and makes it easy to get an accurate cut.
For the rest of the day it was a case of laying a few tiles then stopping to cut a few. The cutting was the time consuming bit and, as is the way of things, it took longer than I'd hoped. It's getting there though!
Today - we're going to switch our attention to the worktops so that we can cut them in the garden while it's not raining (hopefully!).
Labels:
diy,
kitchen makeover
Monday, 29 March 2010
Kitchen makeover: Day 3
Today was a bit of a washout - both in terms of weather, and what we got done. I started the day by reading up on floor tiling. The advice was not to lay ceramic tiles on top of vinyl tiles but if you had to to put a coat of PVA on the floor before laying. Although we took up a layer of floor tile yesterday there was another layer underneath. Even with a heat gun these suckers weren't shifting. Also, they look pretty old and the chances are they could contain asbestos - so on the whole, best to leave well enough alone.
So the first trip of the day was to get some PVA glue. I got the biggest pot I could find thinking it would easily be enough. In the end we were scraping the edges of the pot and the lid, but it just about covered the floor. Then we waited for it to dry... and we waited... and waited. It soon became clear that it's going to take a day for the stuff to dry so we've kind of been at a loose end ever since.
Ordinarily, I'd call it a day and go down the pub but the rain has been torrential so even that wasn't an option.
On the plus side we decided to go out and get our new tap and sink. We also got a bit of timber. Radka had a good idea of putting a wine rack in between the cupboard that we moved yesterday so we got some wood to build them and built the shelves (the wine bottle was to make sure we had the size right!). Unfortunately the decorating has taken over the house a bit and it was to wet to do the sawing outside, so we had a makeshift workshop on the upstairs landing, using the ironing board as a sawhorse. Needs must and all that!
So, no tiling done as yet but at least we got some other bits and pieces out of the way.

Ordinarily, I'd call it a day and go down the pub but the rain has been torrential so even that wasn't an option.
So, no tiling done as yet but at least we got some other bits and pieces out of the way.
Labels:
diy,
kitchen makeover
Sunday, 28 March 2010
Kitchen makeover: Day 2
Today was the paint job. We were a bit late starting today and the hour change didn't help but once we got going we did alright.
After a breakfast of crumpets we got back to preparing the walls for painting. The more you look at them the more cracks and dents you find - after a while you just have to call it a day.
The next job was to mask everything off and cover the cupboards with plastic. This actually took ages. So we didn't start painting until 15:00ish. Although the space is a bit pokey we decided to split the job so Radka did the ceilings and fiddly bits while I covered the bulk of the walls.
Labels:
diy,
kitchen makeover
Kichen makeover: Day 1
However, when we moved in we discovered that (as with the rest of the place) the decorating was either not very well done or hadn't been done for ages.
So, with the wallpaper already stripped Day One was all about preparing the walls for a paint job and getting up those floor tiles.
I found that gloves were essential - as the glue leaves a big sticky mess everywhere. Knee pads were also a bonus as well as having something sharp to get under the corners. After the tiles were up the floor was even stickier than some of the nightclubs I've been in so we needed to put down dustsheets to make it walkable on.
While I was working on this Radka was preparing the walls for painting by chipping away loose paint and sanding down. Then later, as Radka gave me a break from the floor tiles, I applied some fine filler to the edges of flaked off paint. Hopefully this will stop the old paint from rising and creating bobbles when we put wet paint over it. The fine filler I used was Polyfilla One Fill.
So, our kitchen now looks like a bomb has hit it. It's one-pot meals and takeaways for us for the next week while we sort it out. Next job: painting.
Labels:
diy,
kitchen makeover